Site at Night
AD plant nearing completion
13/02/15
SIDOM System
Feedstock optimisation system
22/01/2015
Gas Analyser
Monitors gas output
14/01/15
Control Unit
Operation controls system
14/01/15
CHP Engine
Engine being installed
09/12/14
Norfolk 250kW AD Plant
Aerial shot of latest progress
27/11/2014
Top Drive Shaft
Installation of the drive shaft
10/11/2014
Digester Tank
Tank before cladding
30/09/2014
Trioliet
Preparing position for Trioliet
30/09/2014
Degritting Arm Installation
Installation of degritting arm
17/09/2014
Tank Roof Installation
Digester tank has roof attached
17/09/2014
Tank Walls
Concrete walls being secured
17/09/2014